Explore the Agenda

Pre-Conference Day

Wednesday, July 22

Day One

Thursday, July 23

Day Two

Friday, July 24

7:00 am Check-In & Networking Refreshments

7:50 am Chairs Opening Remarks

Vice President Mission Critical, Satterfield & Pontikes Construction

Staying Ahead of Regional Constraints in the Evolving Texas Market

8:00 am Panel: Analyzing Evolving Texas Trends, Risks, Challenges & Project Conditions: How Can You Stay Ahead Over the Next 12 Months?

AVP - Data Center & Mission Critical Facilities, Black & Veatch
Director MEP, Adolfson & Peterson Construction
Director of Construction, Yondr
Director of Operations, CJM Security Consultants
Vice President Mission Critical, Satterfield & Pontikes Construction
  • Examining how data center project conditions have shifted over the past year, exposing new execution risks you must account for as schedules, budgets, and delivery models tighten
  • Identifying emerging regional pinch points across Texas, including labor saturation, utility congestion and infrastructure strain, to adjust scope, contracting strategy, and sequencing before constraints harden
  • Assessing current mechanical loads, electrical demand, site layout and build sequencing trends in Texas, clarifying where timelines are compressing and where delivery durations are extending under AI-driven density

9:00 am Accelerating New-Build Data Center Delivery by Leveraging Sustainable Construction Materials

VP Strategic Projects & Accounts, Sika USA
  • Translating LEED v5's 50% carbon weighting into practical design and procurement decisions that accelerate approvals, reduce delivery risk, and support sustainability goals
  • Reducing reinforcing steel requirements with synthetic macro fibers to lower concrete carbon emissions by 65%+ while improving installation efficiency
  • Accelerating roof installation with insulated metal roof panels to reduce construction time by 30%, improve thermal performance, and lower onsite safety risks

9:30 am Texas Market Breakouts: Unlocking Regional Execution Strategies for Data Center Projects

Join this interactive, problem-solving session focused on delivering data center projects across rural and urban regions, from permitting variability, design integration and labor availability to supply-chain constraints, power and water usage. How do you succeed across different Texas market conditions?

Right click on the image to save it to your computer.

10:00 am Morning Networking & Refreshments

Strengthening Productivity to Deliver More Resilient Data Centers

11:00 am Increasing Alignment & Communication Between Owners & Project Partners to Accelerate AI-Driven Data Center Delivery

Principal Program Manager, Microsoft
  • Collaboratively developing structured processes for navigating project phases from procurement to commissioning, embedding Early Contractor Involvement (ECI) and Integrated Project Delivery (IPD)
  • Implementing transparent reporting, shared risk/reward structures and aligned performance metrics (DB, CMAR, IPD) to strengthen trust, accelerate approvals, and balance speedto- market with total cost of ownership
  • Integrating owner and operational input early in design through contractor and supplier engagement to reduce commissioning risk, optimize constructability, and leverage advanced construction techniques such as Advanced Work Packaging (AWP) and Construction Optioneering

11:30 am Case Study: Rewriting Contract Structures to Strengthen Trust for a Multi-Billion Dollar Project

Vice President - Construction Sales, T5 Data Centers
  • Using transparent frameworks to define scope, change management, and payment milestones: what contracts did we consider to get the most out of our project partners?
  • Aligning contract-type and timing with the need for early certainty: how we planned labor, locked-in pricing and secured long-lead materials without carrying unnecessary risk
  • Balancing flexibility with escalation and delivery exposure, recognizing how deferred commitments and late approvals increase cost and undermine schedule reliability on projects

12:00 pm Building at AI Speed: Why the Data Center Boom Demands AI-Native Scheduling

Customer Success Manager, Planera, Inc
Head of Sales, Planera, Inc

More than $2.4 trillion in data center projects are planned through 2030. The infrastructure powering AI depends on projects being delivered faster than the construction industry has ever been asked to build, and legacy scheduling tools weren't designed for that reality.

Join us for a live demonstration of AI-native scheduling and see how contractors are using AI to build schedules faster, explore what-if scenarios, answer complex schedule questions, and keep pace with today's accelerated delivery timelines.

You'll leave with a practical understanding of how AI is changing construction scheduling and why modern projects require modern scheduling tools.

Attendees Will Learn

  • Why the real scheduling bottleneck isn't CPM…it's the legacy tools teams are forced to use
  • Where traditional scheduling workflows quietly lose time during planning, coordination, and execution
  • Why field teams abandon the master schedule when projects accelerate, and how leading data center contractors are changing that
  • How AI-native scheduling helps teams build schedules faster, automate logic-driven work, and evaluate scenarios in minutes instead of hours
  • How real-time collaboration transforms the schedule from a monthly report into a daily decision-making tool
  • Practical ways to modernize scheduling without abandoning the CPM fundamentals your team already trusts
Optimizing Construction in the Field

12:10 pm Networking Lunch Break

Aligning Teams to Deliver the Scalable, High-Performance Data Centers of the Future

1:00 pm Fireside Chat: Identifying the Operational Technology Cybersecurity Blind Spot to Protect Data Center Operations & Enhance Resiliency & Uptime

Vice President, Global Industrial Cybersecurity, Black & Veatch
Data Center / Mission Critical Solutions, Black & Veatch
  • Exploring what Operational Technology (OT) cybersecurity is, how it differs from IT security, and why it is becoming an increasingly important consideration for designers, contractors, and operators delivering mission-critical infrastructure
  • Indentifying where vulnerabilities emerge across power distribution, cooling systems, water infrastructure, and building management systems that are designed, installed, and integrated during construction
  • Embedding cybersecurity considerations earlier in the design and construction process, aligning engineering teams, contractors, and operators on system architecture, controls integration and secure commissioning to strengthen long-term operational resilience

1:30 pm Audience Discussion: Defining the Next Generation of Data Centers to Build the More Efficient & Scalable Facilities of Tomorrow, Today

  • Examining technology evolution impacts on facility design, including faster transitions from chip prototype to production and power density growth
  • Identifying strategies hyperscalers and colocators are using in Texas to reduce total power demand and improve operational efficiency
  • Evaluating design adaptations for power-constrained markets to ensure scalability, redundancy and long-term performance

2:00 pm Chairs Closing Remarks

Vice President Mission Critical, Satterfield & Pontikes Construction

2:10 pm End of Advancing Data Center Construction Texas 2026