EPEC Solutions / ReBoSS
EPEC Solutions is a leading manufacturer of electrical switchboards (SWBD) which has expanded its expertise into advanced Data Center power infrastructure. With an emphasis on precision engineering and innovation, EPEC now offers LV AC SWBD, 800V DC SWBD, PDU, RPP, and fully integrated behind-the-meter skid solutions for Data Centers. All products are designed and built in North Carolina to keep pace with the changing needs of today’s high-performance environments.Â
Check out our full selection of Data Center products, designed for outstanding reliability, scalability, and efficiency. Whether you need next-generation 800VDC architectures or modular power distribution systems, we are dedicated to supporting your mission-critical operations with durable and future-focused solutions.Â
EPEC is the top choice for electrical equipment in North American Data Centers, Energy Storage Systems (BESS), and PV plants. Our UL 891 LV switchboards have reliably powered over 2.0 gigawatts of DC, PV, and BESS projects, consistently delivering safe and effective performance.Â
Let the EPEC/ReBoSS team assist your team with your next project [www.epecsolutionsinc.com]. ReBoSS is the national agent for EPEC SWBDs across the USA and Canada [www.rebossinc.com/data-centers].Â